This as-built BIM modeling project was carried out in collaboration with Teknokon engineering firm at the Linde industrial gas production facility in Hungary. The objective was to measure the high-pressure boiler room and connected piping systems using laser scanning and produce an MEP model at LOD 300 level.
Linde wanted to integrate a new production line into their existing facility. For this, they needed to know the exact locations and dimensions of existing MEP systems (piping, pressure vessels, heat exchangers).
Key Challenges:
| Parameter | Value | |-----------|-------| | Equipment Used | Leica RTC360 | | Scan Positions | 180+ | | Accuracy | ±3mm | | Coverage Area | Boiler room + surrounding piping | | Site Duration | 4 Days |
The following systems were modeled in Autodesk Revit from point cloud data:
International Collaboration: This project was conducted through Eos Proje's Budapest office and represents a concrete example of our industrial BIM expertise in Central Europe.
Project Completion: November 2023 Client: Linde Gas (Teknokon Collaboration) Sector: Industrial / Chemical & Gas Location: Hungary
Let us be your solution partner in your international industrial projects. Contact us.
Do you have a similar need for this project? You can determine the most accurate BIM strategy by meeting with our engineering team.